Run both
- Message board upstream to warn of the closure and delays
- Arrow board on the shoulder at the start of the taper
- One arrow board per closed lane
An arrow board tells drivers which way to merge. A message board tells them why, where and when. Pick by the job, and on a busy multi-lane closure, run both. Every trailer here is solar, with no generator to fuel.
Based on MUTCD 11th Edition Sections 6L.05 and 6L.06. Your traffic control plan and the agency that owns the road have the final say.
Arrow boards first, then message signs from smallest to largest. Prices as of September 2026.









Bigger cabinets and wider pixel pitch give bigger characters, which read farther at speed. For roads at 45 mph and up, ask us for the character height of the model before you order.

Neither device replaces the work zone signs. The MUTCD treats a message board as a supplement to conventional signs, and an arrow board works with signs and channelizing devices, not in place of them.
So the Road Work Ahead and lane closed signs, the cones and the barricades still go out, and the trailers do what a static sign cannot.
An arrow is a simple shape, so it reads from farther away than words do. That is why the two work as a pair.
Source: MUTCD 11th Edition, Sections 6L.05 and 6L.06.
An arrow board shows a flashing or sequential arrow, a double arrow or a caution display, and tells drivers which way to merge around a lane closure. A message board, or portable changeable message sign, shows text in up to two phases and tells drivers why: closures, detours, delays and dates.
Arrow and chevron modes are only for lane closures on multi-lane roads. For shoulder work, or a one-lane closure on a two-lane, two-way road, the board shows caution mode only. The MUTCD does not allow an arrow board to show a lane shift.
Type C, which the MUTCD describes for high-speed, high-volume traffic control. It must be at least 96 by 48 inches with at least 15 elements and be legible from 1 mile. All four of our trailer arrow boards have 96 by 48 inch panels with 15 or 25 lamps.
Three lines of eight characters, or a full-matrix display, in no more than two phases. Each phase shows for at least 2 seconds, and both together for no more than 8.
No. The MUTCD treats portable message signs as a supplement to conventional signs and pavement markings, not a substitute. The Road Work Ahead signs, lane closed signs and channelizing devices still go up.
Send the road's speed, the number of lanes and what is closed. We will tell you which arrow board or message sign fits, or whether the plan needs both.